Boeing Data Center Renovation

Size
7,500 SF
Type of contract
Lump Sum
IDIQ Task Order
Location
Fort Belvoir, VA
Completion date
April 2015

TMG performed the demolition and reconstruction of approximately 7,500 SF of data center space for a mission-critical client.

The project involved the installation of new power distribution technology to increase capacity, as well as advanced cooling systems. Specifically, the scope of work included the design of a new rack layout and the installation of three new in-room Air Handling Units (AHUs) and four new Power Distribution Units (PDU) with an overhead bus system. The adjoining administrative office area required slab-to-slab wall construction to separate the data center from office space to provide a more secure environment.

Additional scope included the demolition and installation of all components associated with installation of an overhead Bus system with support (power and air) systems to handle the projected heat load.

The project team completed the project two months ahead of schedule with high degrees of customer satisfaction.

Project photography not allowed at this mission-critical location. Stock image provided.

Award Winning Safety

The very first tenet expressed in TMG’s Values Statement is “Safety Matters.” Using this statement as a guiding principle, TMG has developed an award-winning safety record driven by training and attention to detail.

Award Winning Safety